Perth Amboy, New Jersey

Bridgeport II

Last updated on
September 26, 2026

Logistics and Industrial Development

Sitework at industrial-development scale.

At Bridgeport II in Perth Amboy, New Jersey, VOLLERS carried the complete Sitework package for a 1.2 million-square-foot industrial development across 73 acres.

The redevelopment site brought together mass earthwork, Utilities, site concrete, parking, roadways, and off-site infrastructure work, with existing conditions below grade becoming a significant part of the job.

‍

Sitework

One package across a large site.

VOLLERS’ responsibility extended across the site, from mass earthwork and underground infrastructure through roads, parking, site concrete, and the work needed beyond the property itself.

Off-site work included extending sanitary and water infrastructure to the development along with roadway, curb, and related improvements.

REDEVELOPMENT CONDITIONS

The existing site was still part of the job.

Bridgeport II was a redevelopment of property that had already seen industrial use and prior demolition. As VOLLERS moved through earthwork and excavation, crews encountered existing infrastructure that had remained below grade.

Those unforeseen conditions had to be removed and worked through while the planned Sitework continued across the development.

Across The Work

The site conditions changed how parts of the work had to be approached.

The project combined large-scale earthwork with detailed infrastructure and off-site work. High groundwater affected portions of the underground work, while tighter areas called for smaller, more maneuverable equipment than VOLLERS would typically use for large production earthwork.

Along the waterfront side of the site, access also had to be maintained for an adjacent marine operation while the broader development moved forward.

Project Proof

Substantial Sitework responsibility on a major industrial development.

Complete Sitework responsibility

VOLLERS carried the complete Sitework package across a 73-acre industrial redevelopment.

Scale of Development

The Sitework program supported a 1.2 million-square-foot industrial complex.

Redevelopment and Existing Infrastructure

Prior site use and demolition left existing infrastructure below grade that crews encountered during earthwork and excavation.

‍

On-Site and Off-Site Infrastructure

The package included Utilities within the development as well as off-site sanitary, water, roadway, curb, and related improvement work.

‍

Projects

Explore More of Our Work

Rocklands Logistics Center

New Valley Hospital

NJ American Water Somerville

Discuss a Project

Planning a substantial site package?

Tell us about the site, the conditions already there, and how much of the package you need VOLLERS to take on.